What your inspector will check,  C20E

These procedures are exact replica of the procedures used by the assigned inspector during an inspection. We encourage you to become familiar with the specific procedure before the inspection takes place. You may even use the procedure to verify if your project is ready for the upcoming inspection and to inspect your project and thereby increase the chance of discovering things that need to be corrected.

Click here for the C20E Metal- Fabric_Tube Procedure

Click here for the C20E Composite Procedure

Click here for the C20E Gyrocopter/Helicopter Procedure

Click here for the C20E Major Portion (51%) Procedure